Feature/kpi1 emds integration baseline#468
Open
dmorperd wants to merge 8 commits into
Open
Conversation
|
Azure Static Web Apps: Your stage site is ready! Visit it here: https://salmon-desert-0898cbb03-468.westeurope.5.azurestaticapps.net |
Contributor
Author
vghelu49
previously approved these changes
Jun 24, 2026
vghelu49
left a comment
Contributor
There was a problem hiding this comment.
Some small tweaks suggested in comments. Looks good overall! Would be good to highlight on the README.md the specific tests that are being put forward for the deployEMDS final stack
|
Azure Static Web Apps: Your stage site is ready! Visit it here: https://salmon-desert-0898cbb03-468.westeurope.5.azurestaticapps.net |
Contributor
Author
|
Thanks for the review @vghelu49. I addressed the comments in the same feature branch. Main updates:
|
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
This PR updates the existing KPI1 integration baseline feature by adding the EMDS Final Stack result perspective to the selected deployEMDS technology testing catalogue.
The objective is to support the integration phase assessment of the selected EMDS technical infrastructure, without modifying the historical stack-comparison results for EDC+VC or Fiware.
Changes
Added result_emds_final_stack.md files for the selected KPI1 integration baseline tests.
Updated the root README.md with:
An integration phase assessment description.
A dedicated integration phase test overview.
Links to the selected test.md files.
Links to the corresponding result_emds_final_stack.md files.
Included the federated data space publication tests:
2.2.5.2
2.2.5.7